Thw Great room
Ceiling and lighting in place
The Great Room
This signature space is approaching its final stages.
Great Room Fireplace
The fireplace hearth is prepared for the stone installation
Great Room Fireplace
The Fireplace is getting ready for stone installation
Great Room - Floor levelling complete
Floor levelling is complete, and the flooring is on site and climatizing.
Mezzanine glass railing in place
Glass railings are installed and wood finishing is largely complete
Mezzanine
Fixture installation is underway.
Bedroom 1
Wood purlins and wall panels are substantially complete.
Bedroom 2
Millwork and closet organizers are nearing completion.
Bedroom 2
Shelving with LED lights
Bathroom 1
Stone and wood finishing is progressing well, with fixtures being installed.
Bathroom 2
Lighting now showcases the natural finishes throughout.
Beige Bathroom
Lounge radius walls in place
Lounge radius walls in place
Whistler Chalet pool mosiac underway
The pool level presents some of the most complex requirements of the entire project, including the heated pool, sauna, Hammam, massage room, gym, and waterfall wall.
Progress at Pool area
Extensive envelope detailing has been completed to prevent moisture infiltration. The double radiused ceilings in the Hammam created unique framing and drywall challenges, but are nearly ready for mosaic tile installation.
Ski room panelling nearing completion
Wall and ceiling panels are nearing completion, ski lockers are progressing, and stone wall installation begins this week. This space is shaping up to be one of the finest ski rooms in Whistler.
Cinema Progressing
There are significant rough challenges in this space, as the wood finishes must be integrated seamlessly with a world class sound system. The craftsmanship required is substantial, and the wood finishing team continues to deliver at an exceptional level.
Stairs to Games Room and Night Club
Ceiling planks, purlins, column wraps, and wall panels are nearing completion. Fixture installation is scheduled to begin within the next couple of weeks.